SITECON LTD PROJECT TEAM CAPACITY
SITECON has a policy of employing only the brightest minds. We seek out individuals who are highly qualified and are able to add immense value to our clients. We firmly believe that our success is based on our staff they make our company the reputable specialist it is today.
Teams Available:
We have 5 teams available, and capacity to upscale to 20 teams according to work volumes
Team Composition (Per site)
No. | Team |
1 | Engineer/Supervisor/Team Leader |
4 | Riggers /Machine Operators |
3 | Casual Workers |
1 | Driver/ First Aider |



PPE-QHS COMPLIANCE







SITECON LTD PROJECT TEAM CAPACITY, TOOLS AND EQUIPMENT
Project Type | Team | Engineers |
GSM Site Build- Design-Survey-Audit Civil-Erection- Electrical | 10 | 3 |
BTS Installation Survey + Audit BTS-Antenna-MW Electrical + Commissioning | 10 | 3 |
Managed Service Active Maintenance Passive Maintenance NOC + Warehouse Logistic + Spare | 5 | 3 |
Fiber Optic Network Design-Audit-Mapping Civil-Installation Integration-Commissioning | 10 | 3 |
MSC/MSR Data Centre Design-Civil Construction Electrical-Mechanical-Security | 1 | 2 |
Energy Design-Survey-Route Marking Civil-Erection-Stringing, Transformer Commissioning | 5 | 3 |
Road & Water Design-Survey-Route mapping Civil Works- Electrical Installation -Commissioning | 2 | 2 |
Asset | Quantity | Owned | Leased |
Office Premises | 1 | 1 | |
Office Saloon Cars | 2 | 2 | |
Double Cab Picks + Single 4×4 | 3 | 3 | |
Truck 10T-20T | 5 | 5 | |
Concrete Mixer + Poker/Vibrator | 6 | 2 | 4 |
Compactor + Jack Hammer | 3 | 1 | 3 |
OTDR+ Splice Machine + Dump Level | 3 | 3 | |
DCP Machine + Site Master | 3 | 1 | 2 |
Magnetic Drill+ Impact Range | 4 | 4 | |
Generator 6kv+ Water Pump | 1 | 1 | |
Grinder + Power Drill +Torque Wrench | 6 | 6 | |
GPS + Camera + Compass | 10 | 10 | |
Laptop + Desktop | 8 | 8 | |
PPE + Harness+ Aid Kits (Teams) | 5 | 5 | |
Telecom Tool Kit (Teams) | 5 | 5 | |
Civil Tool Kit (Team) | 3 | 3 | |
Electrical + Fiber Tool Kit (Team) | 5 | 5 | |
Road Works-Excavator + Grader | 4 | 4 | |
Road Works-Bull Dozer + Tipper Truck | 4 | 4 | |
Energy-Stringing and Pulley Tensioner | 1 | 1 |
WHY SITECON LTD?
Re Engineered project management and execution
- Project centric decision making thus reducing on execution timelines
- Medium- and long-term project strategic alliance and partnership-leading to project cost management
- Regional infrastructure experience as an Organization and Resources (Telecom Radio Engineers, Tower Construction and Structural Design team- Regional Organization and Resource Experience)
- Edge cutting Engineering Solution for Telecom + Energy Hybrid Power)
Dedicated account Model + Industry Compliance
- Dedicated Project Team (No sharing of resources)
- Project Manager + Field Team (technical, professional and experienced staff) +Capital Resource
- SMT involvement on Project + Field implementation
- Compliant with Industry standards and License-CAK + NCA + CRB+ OSHA 2007 + ERC + PPDA and Statutory Compliance
Dedicated financial resources
- SITECON LTD is in process of signing long term Credit line for Project, Asset lease financing for Tools and Equipment financing facility with Coop Bank to a tune of $1Million.
- This will ensure timely resource mobilization and project delivery
Our Service Value Assurance To Clients

To Achieve our objectives, we commit to Provide Quality, EHS, Environment, Reliable and Timely Professional engineering services that meet internationally accepted engineering standards and our clients n. We pledge to put in place adequate ,competent & skilled Human Resources that will meet all professional requirements of the services we offer.
We shall also invest in the latest cutting edge technological solutions and engineering equipment that will ensure we meet all our clients needs however dynamic with consistency by being flexible at an affordable cost that offer our clients value for money always.