Sitecon Ltd

SITECON LTD PROJECT TEAM CAPACITY

SITECON has a policy of employing only the brightest minds. We seek out individuals who are highly qualified and are able to add immense value to our clients. We firmly believe that our success is based on our staff they make our company the reputable specialist it is today.

Teams Available:

We have 5 teams  available, and capacity to upscale to 20 teams according to work volumes

Team Composition (Per site)

No.

Team

1

Engineer/Supervisor/Team Leader

4

Riggers /Machine Operators

3

Casual Workers

1

Driver/ First Aider

PPE-QHS COMPLIANCE

SITECON LTD PROJECT TEAM CAPACITY, TOOLS AND EQUIPMENT

 

Project Type

Team

Engineers

GSM Site Build-

Design-Survey-Audit

Civil-Erection- Electrical

10

3

BTS  Installation

Survey  + Audit

BTS-Antenna-MW

Electrical + Commissioning

10

3

Managed Service

Active Maintenance

Passive Maintenance

NOC + Warehouse

Logistic + Spare 

5

3

Fiber Optic Network

Design-Audit-Mapping

Civil-Installation

Integration-Commissioning

10

3

MSC/MSR Data Centre

Design-Civil Construction

Electrical-Mechanical-Security

1

2

Energy

Design-Survey-Route Marking

Civil-Erection-Stringing, Transformer 

Commissioning

5

3

Road & Water

Design-Survey-Route mapping

Civil Works- Electrical Installation -Commissioning

2

2

 

Asset

Quantity

Owned

Leased

Office Premises

1

 

1

Office Saloon Cars

2

2

 

Double Cab Picks + Single 4×4

3

 

3

Truck 10T-20T

5

 

5

Concrete Mixer + Poker/Vibrator

6

2

4

Compactor + Jack Hammer

3

1

3

OTDR+ Splice Machine + Dump Level

3

3

 

DCP Machine + Site Master

3

1

2

Magnetic Drill+ Impact Range

4

 

4

Generator 6kv+ Water Pump

1

 

1

Grinder + Power Drill +Torque Wrench

6

6

 

GPS + Camera + Compass

10

10

 

Laptop + Desktop

8

8

 

PPE + Harness+ Aid Kits (Teams)

5

5

 

Telecom Tool Kit (Teams)

5

5

 

Civil Tool Kit (Team)

3

3

 

Electrical + Fiber Tool Kit (Team)

5

5

 

Road Works-Excavator + Grader

4

 

4

Road Works-Bull Dozer + Tipper Truck

4

 

4

Energy-Stringing and Pulley Tensioner

1

 

1

WHY SITECON LTD?

Re Engineered project management and execution 

  • Project centric decision making thus reducing on execution timelines
  • Medium- and long-term project strategic alliance and partnership-leading to project cost management
  • Regional infrastructure experience as an Organization and Resources (Telecom Radio Engineers, Tower Construction and Structural Design team- Regional Organization and Resource Experience)
  • Edge cutting Engineering Solution for Telecom + Energy Hybrid Power)

Dedicated account Model + Industry Compliance

  • Dedicated Project Team (No sharing of resources)
  • Project Manager + Field Team (technical, professional and experienced staff) +Capital Resource
  • SMT involvement on Project + Field implementation
  • Compliant with Industry standards and License-CAK + NCA + CRB+ OSHA 2007 + ERC + PPDA and Statutory Compliance

Dedicated financial resources

  • SITECON LTD is in process of signing long term Credit line for Project, Asset lease financing for Tools and Equipment  financing facility with Coop Bank to a tune of  $1Million.
  • This will ensure timely resource mobilization and project delivery

Our Service Value Assurance To Clients

To Achieve our  objectives,  we commit to Provide  Quality, EHS, Environment, Reliable  and  Timely   Professional  engineering services that meet internationally accepted engineering standards and  our clients n. We pledge to put in place adequate ,competent & skilled   Human Resources that will meet all professional  requirements of the services we offer.

We shall also invest in the latest  cutting edge  technological solutions and engineering equipment   that will  ensure we meet  all our clients needs however dynamic  with consistency  by being flexible at an affordable cost that offer our clients value for money always.